(925) 257-6590

Concrete parking lot building in Orinda CA - a lot that drains where it should

Gravel lot rutting out and puddling every time it rains? We grade the ground, route the water and pour a concrete lot built to drain.

Stamped concrete patio beneath a timber pergola, with a curved reddish-brown border and stone retaining wall.
  • Licensed and fully insured.
  • Free quotes on site.
  • Expect a reply within 1 business day.

What goes into building a concrete parking lot in Orinda?

Building a concrete parking lot in Orinda starts with earthwork, digging out and filling to shape the ground, and ends with a paved lot that gives your cars a firm, flat place to park. Paving that much ground also creates runoff, so a good part of the job is deciding where the rain goes.

Most folks who call about a lot have outgrown their gravel or an old surface, and they want parking that holds up to the cars and trucks it sees every day. What moves the price is mostly how much dirt has to move and how much drainage the lot needs. What moves the schedule is usually permits, since a bigger lot or a lot of digging can bring in grading and drainage review before anyone breaks ground. If your job needs a permit, we can pull it as your contractor and handle the paperwork and inspection calls for our part, and the on-site estimate is where you get your own figure in writing.

How can you tell your parking area is ready for concrete?

Ruts and potholes in gravel

Tires dig ruts that refill with water every storm, which usually means the ground underneath is soft and the gravel is being pushed down into it. Every season you wait, more rock disappears into the mud and the eventual dig-out gets deeper.

Water sitting or running wrong

Puddles that hang around for days, or a sheet of water heading for a garage door or the neighbor's yard, mean the surface was never shaped to send runoff anywhere useful. Left alone, that water keeps softening the ground under the lot and around the buildings beside it.

Cracked or sinking old paving

Slabs that have dropped, tipped or broken into pieces usually sat on a base that was never packed or got washed out over the years. Patching the top doesn't last long when the trouble is underneath, and every broken edge is one more place to trip.

How we build a concrete parking lot

Most of the work on a lot is the dirt and the water, so we plan how much earth moves and where the runoff goes before we ever talk about the concrete. We dig out the soft stuff down to firm subgrade, the ground the slab rests on, then bring in base rock and pack it in layers instead of raking it smooth, because a raked base settles under the first heavy truck. We set the forms so the whole lot falls away from buildings and toward wherever the water's meant to go. We pour early in the day when we can, since midday heat dries the top too fast and leaves it weak and dusty later, and we give it a broom finish, a lightly brushed texture so tires and shoes grip when it's wet. Concrete cracks a little, so we cut control joints, shallow grooves that give the slab a place to crack in a straight line instead of wherever it pleases. Then it cures, the wait while it hardens enough to carry cars, and we keep traffic off until it's ready. If the budget gets tight, I'd rather trim the finish than the base, because nobody sees the base on pour day, but like we said on the farm, a barn's only as good as what it sits on.

A lot rarely stands by itself. Anything that has to stand up at its edge, like light poles, a carport or a gate, sits on concrete footings that we pour before the slab goes in. And if a building next to the lot has settled, often because water off the old surface soaked the ground beside it, we'd look at foundation raising before we pave up against it.

  • New lot on open ground

    This suits a dirt or gravel area that's becoming real parking for the first time. Most of the planning goes into grading and drainage, since that ground has never had to carry a slab or shed this much water.

  • Tear-out and replacement

    This suits an old lot that's cracked, sunk or broken up. We break out and haul off the old surface and fix what's under it, because a failed base is usually why the old one gave out.

Get a written estimate for your new parking lot

Send the form and expect a reply within one business day, and most of the time it's me calling you back. I'll set a time to walk the lot with you, and the estimate is free, done on site and comes with no obligation. Afterward you get it in writing, with what's included spelled out.

(925) 257-6590

Orinda rules that shape a concrete parking lot

Size is what changes a parking lot job here. Contra Costa County's stormwater permit generally requires roads, sidewalks and other facilities that create or replace 5,000 square feet of hard surface, the kind water can't soak into, to add stormwater facilities sized to the county's set criteria, so a larger lot can carry real drainage work in its design. In Orinda, work that needs a building permit also goes through the city's Planning Department, which checks zoning, unless the project is on the city's exempt list. Anything built in the public right-of-way, like where your entrance meets the street, needs an encroachment permit from the City of Orinda Public Works Department. We sort out which of these touches your lot early on and check with the right office before we start, rather than guess.

Lots around here are often cut into a hillside or sit below a road, so water is already headed somewhere before we show up, and our job is to give it a better route than across the slab or toward a building. We see the same slopes and runoff on jobs in Moraga and Lafayette, and we plan for them the same way.

What happens when you call about a parking lot in Orinda?

  1. Call or send the form

    Call (925) 257-6590 or fill out the form, and I'll set a time to come out to the property. Tell us roughly where the lot goes and what will park on it.

  2. Walk the lot together

    I look at the ground, where the water runs and anything in the way, and ask what the lot has to carry, from a couple of cars to delivery trucks. You get a written estimate that says what's included, like whether hauling the old surface away is part of it.

  3. Line up permits, then pour

    Once you're ready, we line up any permits and utility marking, where buried lines get flagged, before we dig, then our crew lead and finishers prep the base, form, pour and finish, and I'm usually there on pour days. I walk the finished lot with you before we pack up.

Frequently asked questions

How much does it cost to build a concrete parking lot in Orinda?

The cost of a concrete parking lot here comes down mostly to how much earth has to move and how much drainage work the lot needs, more than the concrete itself. A bigger or steeper lot, tearing out and hauling an old surface, and a job that needs engineered plans or added stormwater work all push the number up, while a small, fairly flat lot on firm ground keeps it down. I'll give you a written figure after walking the property.

Who issues building permits for a parking lot in Orinda?

The Contra Costa County Building Department reviews and issues building permits for Orinda. The city requires one before anyone erects, constructs, alters or repairs a building or structure, and whether your lot's work falls under that is something we confirm with the county for your job before we start.

How do I know if my parking lot needs a grading permit in Orinda?

The city requires a grading permit when a project digs out fifty cubic yards or more of earth or brings in two hundred cubic yards or more of fill, among other conditions, so the amount of dirt your lot moves is the first thing to check. The county's grading permit calls for a soils report and plans signed by a licensed California civil engineer or architect, though the county building official may waive the signed plans for small and unimportant work. When an engineer is involved, we build from their plans and stay in touch with them.

Does a new parking lot need a drainage plan in Contra Costa County?

It may, since the county says a drainage plan may be required when a project adds 1,000 square feet or more of new hard surface, or 500 square feet or more on land sloped over 10 percent. Plenty of lots reach that, and on a hillside it takes less than you'd think, so we plan the runoff from the first visit either way.

Can pervious concrete cut down on drainage work for a parking lot?

It can, because pervious concrete lets water soak through, and one concrete trade group says it reduces runoff from paved areas. That group says it can shrink, and in some cases do away with, separate stormwater retention ponds, and it allows smaller storm sewers. Whether it suits your lot is worth weighing against the county's rules and your engineer's plans before anyone picks a mix.

How do I take care of a concrete parking lot?

Typical upkeep on a concrete lot is cleaning and restriping, sealing cracks, repairing spalls, which are spots where the surface has chipped or flaked off, and replacing or stabilizing a slab that's moved. Most of that is small work, and catching cracks early keeps water from getting under the slab.

Orinda, CA

Start planning your concrete parking lot

Have a site plan, the lot's rough size in square feet and a note on how steep it is handy when you call (925) 257-6590, fill out the form or email hi@orindaconcrete.com, and our first walk can go straight to the dirt and the water.

(925) 257-6590Request a quote