(925) 257-6590

Concrete Driveway Building in Orinda CA - a slab that sheds water away from the house

Cracked, sinking or puddling driveway? We dig out the soft ground, pack a solid base and pour a slab that drains the right way.

Decorative concrete driveway with an irregular stone pattern leads to a detached garage, edged with low block borders.
  • Licensed and fully insured.
  • Free quotes on site.
  • Expect a reply within 1 business day.

What goes into building a concrete driveway in Orinda?

Building a concrete driveway in Orinda means we dig out the topsoil and any soft spots, pack the ground underneath, then form, pour and finish a new slab that's sloped so rain runs off it instead of sitting on it or heading for your garage.

Most folks who call about a driveway have an old one that's cracked, sunk or holding water, or a gravel drive they're tired of raking. The price comes down to the size, how thick the slab has to be for what you park on it, whether we reinforce it, and whether the old driveway has to be broken up and hauled off first. The schedule mostly turns on the city permit for the street end and the curing time once it's poured, because nobody drives on a fresh slab until it's ready. When I walk the job with you, the estimate puts all of that in writing so you can see what moves your number.

How can you tell your driveway needs replacing?

Cracks that keep spreading

A fine crack or two is normal, but cracks that widen, chip at the edges or split the slab into chunks usually mean the ground under it is moving. Each rainy season lets more water down into those gaps, and what could have been a repair turns into a full tear-out.

Sections that sink or tip

When one section drops below its neighbor or leans toward the garage, the base under it has usually washed out or was never packed in the first place. The longer it goes, the bigger the trip edge gets and the more of the slab gets dragged down with it.

Water that pools or runs wrong

Puddles that sit for a day after rain, or a sheet of water running at your garage door, mean the slab wasn't sloped to send water somewhere useful. That water softens the dirt under the concrete and can find its way into the garage, so it costs more the longer it keeps running.

How we handle concrete driveway building

We start by breaking out the old driveway or stripping the topsoil, then dig out the soft spots and pack the subgrade, the dirt the slab sits on, so it won't settle later and take the concrete down with it. Before a single form goes in, I check where the water runs, because a slab that falls toward the house is a problem you've paid to build. If you want rebar, the steel bars laid inside the slab for strength, it goes in next, and then we pour in the cooler part of the day where we can, since midday heat can leave a weak, dusty top that wears early. The surface gets a broom finish, a light texture that gives tires and shoes some grip, and we cut control joints, grooves placed on purpose, early so the slab cracks along our lines instead of wherever it pleases. Then we keep the new slab covered and damp while it cures, the slow set that makes concrete hard. If the budget gets tight, I'd rather trim the finish than the base, because nobody sees the base on day one but it decides whether your driveway stays flat. Back on the farm we'd say you don't fix a leaky trough by painting it.

A driveway job is a good time to think about the rest of your flatwork, the flat concrete around the house. If you've been wanting a spot to sit out back, our concrete patio construction uses the same base and drainage work, and doing it while we're set up saves a second round of digging. For a front entry with more character than plain gray, stamped concrete services can add a pattern along the edges or across the entry.

  • Standard driveway for everyday cars

    This suits most houses where the driveway carries a couple of cars, because a standard slab on a well-packed base handles that weight fine. It gets a broom finish and cut joints, and it's the plainest way to a driveway that drains right.

  • Thicker, reinforced slab for heavy loads

    This suits you if you park a truck, an RV or a trailer, or if delivery trucks back in, since heavier loads call for more concrete and steel. It's the bigger spend, so I'll talk it through with you and you won't pay for strength your driveway doesn't need.

Get a written driveway estimate, free on site

Send the form and you'll hear back within one business day, and most of the time it's me calling. I'll set a time to walk the driveway with you, and the written estimate is free with no obligation to go ahead.

(925) 257-6590

Concrete driveway building in Orinda starts at the street

Where your driveway meets the road, the city's Public Works department issues the encroachment permit for building or replacing a driveway in or next to the right-of-way, the strip along the road the city controls. On that stretch the city sets a minimum concrete depth and base, and it wants the driveway sloped so a thin sheet of rainwater doesn't run out onto the road, with the drainage protected and nothing washing away. That shapes the street end more than any other part of the plan, so we pull the permit as your contractor, handle the paperwork and inspection calls for our part, and build that section to the city's standard before we worry about the rest.

Water is the other thing Orinda watches. Projects that create or replace 2,500 square feet or more of hard surface like pavement need at least one way to handle the runoff, such as sending it onto planted areas, into rain barrels or through permeable paving. A long driveway plus a new patio can add up quickly, so I measure the whole job on the first visit. We're based in Orinda and work on both sides of the hills, and we plan the runoff just as carefully on driveways in Moraga and Lafayette.

What happens after you call about a new driveway in Orinda?

  1. Call and set a visit

    You call (925) 257-6590 or send the form, and I set a time to come out. I walk the driveway with you and look at the ground, where the water goes and anything in the way, like trees or a utility box.

  2. Read your written estimate

    You get it in writing, with the size, the thickness and reinforcement we talked about, and whether breaking out and hauling the old driveway is included. That way you can line it up against other bids and see exactly what's in the number.

  3. Line up permits and utility marks

    Once you're ready, we set up the city's field meeting with its Public Works Inspector at your site, which comes before the encroachment application and sets the fee from the inspection hours the inspector expects. We also get the utility lines marked before anyone digs.

  4. Prep, pour and walk it

    Our crew preps the base, forms, pours and finishes, and we call the city at least 48 hours before starting or restarting work at the street, since work done without inspection may have to be torn out and redone. When it's done, I walk the finished driveway with you before we pack up.

Frequently asked questions

How much does a concrete driveway cost in the Bay Area?

A new concrete driveway in the Bay Area usually costs about $8 to $16 per square foot, and that doesn't include tearing out an old driveway. That's the going rate across the region, not a quote for your job. I'll give you your own figure in writing once I've measured and seen the site.

Do I need a permit to replace my driveway in Orinda?

Yes, the part of your driveway that reaches the street needs the city's encroachment permit described above. If your plan also changes the grading or drainage on the lot, those permits come from the county's Lamorinda building office, which works with the city's engineering department. I check with the right office on your job before we start rather than guess.

How thick should my driveway be?

Four to five inches is the standard for a Bay Area driveway and is usually plenty for regular cars, while owners of trucks or RVs may want six to eight inches. The street end still has to meet the city's own minimum depth no matter what you pick for the rest. Tell me what you park on it and we'll settle the thickness at the estimate.

What is the best way to keep a new concrete driveway from cracking?

No driveway is crack-proof, and national concrete trade guidance says wire mesh and rebar can't prevent cracking, though reinforcement placed in the right spot can keep cracks narrower. The base, the joints and the cure do most of the work of keeping cracks small and where we want them. I'd rather tell you up front you'll likely see a few fine lines than promise you won't.

How long does a new concrete driveway take to cure?

National concrete trade guidance says curing should start as soon as possible and run at least three days, under a sprayed curing compound or damp burlap kept wet. That step matters because it's what makes the slab tough and slower to crack. I'll tell you on pour day when it's ready for feet and when it's ready for the car, since the mix and the weather both play into it.

Does a driveway contractor need a license in California?

Yes for nearly any driveway, because California only lets unlicensed people take jobs under $1,000 that need no permit, and only if they have no employees. A driveway usually runs well past that and touches the city's street permit too. Ask anyone you're comparing for their state license before you sign.

Orinda, CA

Book a visit for your new driveway

Tell us roughly how many square feet it is, whether an old driveway comes out and what you park on it, by phone, email at hi@orindaconcrete.com or the form, and I'll show up ready to talk it through.

(925) 257-6590Request a quote